Higgins Mountain Wind Farm Phase I Location of Three Units at Higgins Mountain The three existing turbines on
Prior to construction, an environmental assessment was conducted and the project was approved by the Minister of Environment in Fall 2006. A copy of the environmental assessment report can be downloaded here. The Minister’s approval stipulated follow-up study of the potential impact on birds and bats, plus erosion and sediment control, and such studies have been ongoing. For enquiries in regards to these studies, Graham Findlay can be reached at (613) 769-1300.
The site is situated about 2 km south of
Westchester Station, in a mountain range called the ![]() Click here to download a copy of the environmental assessment for the Higgins Mountain I Project. |